Gas Generator Sets Project Cases
CCHP(Combined Cooling Heating And Power)system used in
China United Property Insurance Co.Ltd
The project is built by Simply(Weifang)International Trade Co.Ltd. which is equipped with 2 sets of SITC
Caterpillar natural aas generator sets CG170-16. The sinale unit power is 1500kWIn order to improve the
energy comprehensive utilization,guarantee the stability of the power project it will parallel with mains. The
generated electricity is sent to the mains to offset the project’s own electricity consumption. In case of mains
failure, to ensure the safety of the external power grid,the system will automatically break off the external
highvoltage power supply switch,and the generating unit will supply power directly to the project itself.When
the mains is back to normal,the system will automatically identify the external power grid status, and control
the generator way of automatic tracking of external power arid operation parameters by automatically ad-
justing the rotational speed, voltage and phase angle, generators run automatically in parallel consisting of a
group and the utility grid parallel operation again.